Introduction to Design Fees

If you ask around, you’ll probably come to find that design fees can be difficult to track. There are many factors that go into determining design fees, and multiple ways in which they can be structured over the course of any given project. Additionally, depending on the scope of your project, you may need to procure services from multiple design or engineering consultants in order to produce the necessary deliverables to get your project approved.

Our goal here is to help you understand (as a baseline reference) what industry standards and guidelines exist, and how we approach our fees.


How do Architects typically calculate fees?

Fees are built from one of these two core foundations:

  • Bottom-Up Pricing: understanding the amount of time and effort required for each specific task/phase and adding that time up

  • Top-Down Pricing: this method involves establishing a total fee based on historical project data or as a percentage of the construction budget and dividing that fee up proportionally into each phase of the project

Specific fees for a project can be calculated in a number of different ways:

  • Hourly (billed monthly)

  • Fixed-fee or lump-sum (billed by phase)

  • Percentage of construction budget or cost (billed by phase)

Depending on the specific client and project, the approach may vary, but the end result is generally the same or similar. These different approaches may make sense for some projects, and not others. For example, projects with an unknown scope of work or budget will likely utilize an hourly fee (at least to start). Projects with a clear scope and budget will likely utilize either a fixed-fee, or percentage of construction budget/cost approach.

At the end of the day, calculating fees comes down to clearly understanding the the client’s needs, the scope of work, and how much time it will take to complete the work. Regardless of how we present our fees to our clients, we are always analyzing our fees using each of the methods described above.


What is a typical rate for an Architect?

Industry standards shown as a percentage of construction costs:

3 - 15%+

Industry standard hourly rates:

$80 - $200+

Important questions to ask your Architect:

  • What services are included in their basic services scope?

  • Does their fee include design consultant’s fees?

  • What happens when/if the scope of work changes as the project progresses?


Understanding Basic vs. Additional Services

Basic Services

Typically involves the baseline level of services required in order to design the project and develop a complete set of permit & construction documents.

  • Pre-Design: research the project and site to understand limiting factors of zoning and building codes and develop building area and massing strategies

  • Design: commonly broken into two phases (Schematic Design & Design Development), developing and refining design concepts, coordinating consultant’s designs, reviewing aesthetic/material qualities, understanding major building assembly requirements (floors, walls, roof/ceilings)

  • Documentation: developing a coordinated and detailed set of permit and construction documents to deliver to the client for project approval, involves coordinating consultant’s work, finalizing project specifications (materials, assemblies, products/equipment, etc…)

  • Construction Administration: oversight of the construction progress, ensuring the project is built according to the project documents, developing reports

Additional Services

Services that are commonly outside of the Architect’s basic scope of services

  • Existing conditions documentation (by the Architect or a third party consultant)

  • Renderings

  • Interior Design / interior detailing (material/finish selections and specifications, detailing of interior built-ins/cabinetry/other millwork - may be provided under an Interior Designers scope of work)

  • Landscape Design / drawings (may be provided under a Landscape Architect)

  • Drawing revisions due to re-design at the client’s request or due to unforeseen project conditions

  • As-built drawings (drawing documentation of the project upon substantial completion)

  • Supplemental drawings or documentation in connection with public or administrative project approval hearings - this can also include attending/speaking at public hearings

  • Additional fees incurred due to travel, printing services, or other unforeseen project costs


What other factors may impact an Architect’s fee?

Outside the lines of strictly performing the basic level of services required to design and document any project, there are a number of other factors that can impact the scale of an Architect’s rate:

Project Consultant’s Fees

The following represents a general order of magnitude for typical consultant fees (fees may be expressed as a dollar amount or percentage of construction cost):